Concrete Calculator in Cubic Meters and Yards

A concrete calculator in cubic meters and cubic yards for a slab, footing, wall or round post, with premix bags, site-mix materials and cost.

Units
What are you pouring?
m

m

cm

Patios and paths are usually 10 cm; driveways 10–15 cm.

pieces

%

5–10% covers spillage and an uneven base.

Only changes the cement, sand and gravel rows.

Ready-mix price in USD, to estimate the cost.

Concrete needed

1.26 m³including 5% extra
Without the extra
1.2 m³
In yd³
1.65 yd³
Premix bags (25 kg)
108
Premix bags (40 kg)
68
Cement (50 kg bags)
8 (399 kg)
Sand
0.55 m³
Gravel (coarse aggregate)
1.11 m³

How to use the Concrete Calculator

  1. Choose a slab, footing or wall, or a round column or pier.
  2. Enter the measurements: length, width and thickness, or diameter and height. Use the Metric / Imperial switch at the top to change units.
  3. Set how many identical pieces you are pouring and an extra allowance for waste, usually 5% to 10%.
  4. Read the volume to order, the number of premix bags, and the cement, sand and gravel for mixing on site. Add a price to see the cost.

Formula

V = L × W × D (slab) · V = π × (d ÷ 2)² × H (column) · Order = V × n × (1 + e ÷ 100)

Where:

L, W
Length and width of the slab, footing or wall, in m or ft
D
Thickness or depth, in cm or in (converted to m or ft before multiplying)
d, H
Diameter and height of a round column or pier
n
Number of identical pieces
e
Extra allowance for spillage, over-excavation and an uneven base, in percent

1 yd³ = 27 ft³ = 0.764555 m³. Premix bags assume a yield of 0.60 ft³ per 80 lb bag (about 0.0117 m³ per 25 kg). Site-mix materials use a dry-volume factor of 1.54 and cement at 1,440 kg/m³.

Worked example

A driveway is 20 ft long, 12 ft wide and 5 in thick. You add 10% extra, and ready-mix costs $165 per cubic yard.

  1. Convert the thickness to feet: 5 ÷ 12 = 0.4167 ft.
  2. Volume = 20 × 12 × 5 ÷ 12 = 100 ft³. Divide by 27 to get cubic yards: 3.70 yd³.
  3. Add 10% extra: 100 × 1.10 = 110 ft³, or 4.07 yd³.
  4. Cost = 4.0741 × $165 = $672.22.
  5. If you mixed it from 80 lb bags instead, you would need 110 ÷ 0.6 = 183.3, so 184 bags.

Order about 4.07 cubic yards (110 ft³) of concrete, which costs roughly $672 at $165 per yard.

How many cubic meters of concrete you need

Concrete is ordered by volume: cubic yards in the United States, cubic meters almost everywhere else. The tool handles rectangular slabs, footings and walls, and round columns such as deck piers in cardboard tubes (sonotubes) and fence-post holes. In South Asia ready-mix is often called RMC or transit-mix.

  1. Measure the inside of the formwork, not the drawing. The concrete fills the actual space.
  2. Take several depth readings and use the average. A slab planned at 10 cm that averages 11 cm needs 10% more concrete.
  3. Split complex shapes. A slab with a thickened edge is a thin slab plus a strip footing around the edge.
  4. Count repeated pieces once. Eight identical piers are one column with a quantity of 8.

Premix bags per cubic meter and per yard

Standard bagged concrete yields roughly 0.6 ft³ per 80 lb bag, and smaller bags scale in proportion. Turned into a yield per kilogram, that gives the counts below for a full cubic meter or cubic yard, before any extra:

Bag sizeBags per m³Bags per yd³
20 kg106.881.6
25 kg85.465.3
40 kg53.440.8
40 lb117.790
60 lb78.560
80 lb58.945

The results panel counts 25 kg and 40 kg bags in metric, or 60 lb and 80 lb bags in imperial, always rounded up. For other sizes, divide the volume by the yield printed on the bag.

Bags or ready-mix? Below roughly 1 m³ (about 1.3 yd³), bags or a hired mixer are usually practical. Above that, hand mixing is slow and many small batches can leave weak joints. Trucks often have a minimum load, so a small part load can cost more than bags.

Concrete for posts and round columns

For a round shape the volume is π × r² × h, where r is half the diameter. Doubling the diameter quadruples the concrete, which is why a 12 in tube needs about 2.25 times as much as an 8 in tube.

Worked example: deck piers in metric. A deck stands on 8 round piers, each 25 cm across and 1.2 m deep, poured with a 1 : 1.5 : 3 mix and a 10% extra.

  • Radius = 0.125 m. One pier = π × 0.125² × 1.2 = 0.0589 m³.
  • Eight piers = 0.4712 m³. With 10% extra: 0.5184 m³ (about 0.68 yd³).
  • Premix: 0.5184 ÷ 0.0117 = 44.3, so 45 bags of 25 kg, or 28 bags of 40 kg.
  • Site mix: dry volume = 0.5184 × 1.54 = 0.798 m³. Cement is 1 part in 5.5, which is 0.1452 m³ or 209 kg, so 5 bags of 50 kg. Sand is 1.5 parts (0.218 m³) and gravel 3 parts (0.435 m³).

At this size, bags are the sensible choice.

Cement, sand and gravel for site mixing

Dry ingredients shrink when water is added, as sand and cement fill the gaps between stones. To get 1 m³ of finished concrete you need about 1.54 m³ of dry material. That dry volume is split in the ratio of the mix, and cement is converted to weight at 1,440 kg per cubic meter, then to whole bags of 50 kg (metric) or 94 lb (imperial).

Three nominal mixes are offered. 1 : 1.5 : 3 is roughly M20, used for structural members; for 1 m³ it takes about 403 kg of cement (just over 8 bags of 50 kg), 0.42 m³ of sand and 0.84 m³ of aggregate. 1 : 2 : 4 (about M15) suits general work, and 1 : 3 : 6 is a lean mix for blinding under footings. Use clean sand, since clay or silt weakens the mix.

Common mistakes

  • Mixing units. Entering a 4 in slab as 4 ft makes the order 12 times too large. Check the unit beside each field.
  • Using diameter as radius. The column fields ask for the diameter and halve it for you.
  • Forgetting the dry-volume factor. Adding 1 + 2 + 4 parts to make exactly 1 m³ leaves you about a third short.
  • Adding water to make it flow. Extra water makes concrete noticeably weaker.
  • Treating nominal mixes as a design. Structural concrete should be specified by strength and checked with test cubes or cylinders.

Assumptions

Volumes are exact for the dimensions you enter. Shapes are limited to rectangular slabs, footings and walls and round columns: steps, stairs, slopes, haunches and curbs need to be split into these pieces by hand, and rebar and labor are not included. Bag counts assume 0.6 ft³ per 80 lb of standard premix; high-strength and fast-setting products yield slightly less. Site-mix quantities use a dry-volume factor of 1.54 and a cement bulk density of 1,440 kg/m³, and ignore water. For load-bearing work, follow your local building code and an engineer's design.

Frequently asked questions

How much concrete do I need for a 10x10 slab?

Multiply length × width × thickness in the same unit. A 10 ft × 10 ft slab 4 in thick is 10 × 10 × 4 ÷ 12 = 33.3 ft³, which is about 1.23 yd³ (divide cubic feet by 27). Add 10% for waste and order about 36.7 ft³, or 1.36 yd³. In meters the answer is already in cubic meters.

How many bags of concrete are in a yard?

About 45 bags of 80 lb, 60 bags of 60 lb or 90 bags of 40 lb, because an 80 lb bag of standard premix yields roughly 0.6 cubic feet and a cubic yard is 27 cubic feet. In metric terms, a cubic meter takes about 86 bags of 25 kg. Check the yield printed on your brand's bag.

How many bags of concrete do I need?

Divide the volume, including your extra, by the yield of one bag and round up. For the 10 ft × 10 ft × 4 in slab above, 36.7 ft³ ÷ 0.6 ft³ = 61.1, so 62 bags of 80 lb. A slab that size is near the point where a ready-mix delivery or a hired mixer becomes easier than mixing bags by hand.

How thick should a concrete slab be?

Paths and patios are commonly 4 in (10 cm), driveways for cars 4 to 6 in (10 to 15 cm), and slabs that carry heavier vehicles or equipment thicker again, usually with reinforcement. Local building codes and the ground conditions decide the final figure, so check them before you set the depth.

How much concrete do I need for a fence post?

Treat the hole as a round column: V = π × r² × h. A hole 12 in wide and 4 ft deep holds 3.14 ft³ (0.12 yd³), about 6 bags of 80 lb. The post itself takes up a little room (a 4 × 4 post, 3.5 in actual, fills 0.34 ft³ over 4 ft), so the result leaves a small margin.

Is a cubic meter the same as a cubic yard?

No. A cubic meter is about 1.31 cubic yards, and a cubic yard is about 0.765 cubic meters. Ready-mix is sold by the cubic yard in the US and by the cubic meter in most other countries, so check which one your quote uses before you compare prices.